Showing posts with label trains. Show all posts
Showing posts with label trains. Show all posts

Monday, January 29, 2024

New 273 Series Train for JR's Yakumo Limited Express from 6th April 2024

Source: https://www.jr-odekake.net/railroad/yakumo/

Introduction

As the 381 Series running on JR West's Limited Express Yakumo service between Okayama and Izumoshi stations in Shimane Prefecture have been operating since 1982 and is retiring this June, it is going to be replaced by the 273 Series from 6th April this year onwards.

An artist’s impression of the Limited Express Yakumo running past Mount Daisen in Tottori Prefecture

According to JR West's Odekake website special page, it shows that the 381 series had been running since the JNR era and is going to be replaced due to aging equipment. Also, the fact that its operation spans three Japanese eras of Showa, Heisei, and Reiwa and the last surviving JNR Era limited express rolling stock is what invokes nostalgia among train otakus.


One reason why JR West decided to introduce a new rolling stock for the Yakumo limited express service is that the newer 273 series will offer a smoother ride around the route's many curves, as the 381 series is infamous for plaguing passengers with motion sickness due to their considerable tilt on curved sections along the route. 

The 381 series is designed to travel on curved sections without needing to slowing down by tilting inward to suppress centrifugal force, causing a wide, slow shaking side to side, causing the passengers to get trainsick because of the constant tilting and swinging. 


Route Map of the Yakumo Limited Express

Future operation plans of the renewal rolling stocks of the Yakumo limited express:






About the new 273 Series Yakumo limited express


The new rolling utilises "natural pendulum system with on-board control" (Japanese: 車上型の制御付自然振り子方式) technology jointly developed by JR West, the Railway Technical Research Institute, and Kawasaki Heavy Industries. Unlike the 381 series which relies on natural centrifugal force for tilting, the 273 series tilts optimally to improve passenger comfort*.

*Motion sickness evaluation index improved by up to 23%


Due to its appearance, the new rolling stock is officially nicknamed "Yakumo Bronze (やくもブロンズ)" due to the fact that is respect the nature, scenery, culture, and history of the area along the towns where the train is run. The livery of the train is a represention of different icons of the San'in region, which is the deep golden color of the sunset over Lake Shinji, the golden color of the tatara ironworks, the bronze color of the torches of the Daisen Summer Opening Festival, and the shakudo of the red tiled townscape. Also, the designer of this train is Yasuyuki Kawanishi, who also designed West Express Ginga and Setsugekka sightseeing trains. 


Interior layout of 273 series

The following diagrams are the interior layout for the new 273 series

Car 1



Car 2



Car 3



Car 4


Facilities


Baggage Space



Washroom




Seating on board 273 series Yakumo

Ordinary Reserved Seating 普通車指定席: Seating formation in the ordinary carriages will be in rows of four in a 2 + 2 configuration, and the seats will be colored green as a reflection of the green mountains dotted along the train’s route.



Green Car グリーン車指定席: The warm colors from the exterior continue in the first class green cars which will have yellow seating in rows of three in a 1 + 2 pattern.


Semi Compartment グループ席: Comes with tables of 4 or tables of 2, so that families/groups can face one another while enjoying the views from large windows with foldable tables and side partitions to enhance privacy. 





References:


(in Japanese) 381 系特急やくも「リバイバル塗装車両」の今後の運行計画について. (n.d.). https://www.westjr.co.jp/press/article/items/231215_00_press_381yakumo.pdf 

Honolulu Star-Advertiser. (2024, January 25). Express train tuned up to reduce motion sickness. Advertiser. https://www.staradvertiser.com/2024/01/25/news/express-train-tuned-up-to-reduce-motion-sickness/ 

New Limited Express yakumo train designs revealed. Japan Station. (2023, March 21). https://www.japanstation.com/new-limited-express-yakumo-train-designs-revealed/ 

NEWS: JB-Singapore RTS Link progress on track, says MRT Corp CEO

 Source: Free Malaysia Today

The 4km RTS Link was 65% complete as of Dec 31, 2023, surpassing the target of 57%.

Danish Raja Reza and Ameer Fakhri - 11 Jan 2024, 10:30am

JOHOR BAHRU: The Johor Bahru-Singapore Rapid Transit System (RTS) Link is on track to be completed as scheduled by December 2026, says Mass Rapid Transit Corporation Sdn Bhd (MRT Corp).

MRT Corp CEO Mohd Zarif Hashim stressed the importance of the company’s subsidiary, Malaysia Rapid Transit System Sdn Bhd, adhering to the timeline agreed on by the two nations.

“The completion of the connecting span is a pivotal moment in the overall progress of the RTS Link, as it brings together the marine viaduct of both countries,” he told reporters in an interview.

The 4km RTS Link was 65% complete as of Dec 31, 2023, surpassing the target of 57%. It connects two stations: Bukit Chagar in Johor Bahru and Woodlands North in Singapore.

At the commemoration ceremony of the completion of the connecting span of the RTS Link this morning, transport minister Loke Siew Fook said that the project had reached 68% completion.

Zarif also highlighted the project’s significance in enhancing the nation’s transportation system by establishing a seamless cross-border infrastructure to better serve the people.

He thanked Putrajaya and the Johor government for their assistance and support in realising the RTS Link.

It was previously reported that the project was expected to pull in 35% of the 350,000 people who travel across the Causeway daily.

Currently, a cross-border shuttle bus journey to Singapore from the customs, immigration, and quarantine complex at the Sultan Iskandar building ranges from 45 minutes to four hours, depending on traffic conditions.

With the RTS link, Zarif aims to slash travel time to just 15 minutes.

“The 15 minutes start from the point when you arrive at Bukit Chagar station until you reach Woodlands North station,” he added.

The light rail link will cater to up to 10,000 commuters per hour per direction during peak periods. It will be operated by RTS Operations Pte Ltd, a joint venture between Prasarana Malaysia Bhd and SMRT Corporation Ltd of Singapore.

Map of RTS Link




More about JB Singapore RTS Link:

granny2003. (2020, August 18). JB Singapore RTS Link to be completed by 2026. https://eatdrinksleepwakeuprepeat.blogspot.com/2020/08/jb-singapore-rts-link-to-be-completed.html 

(in Malay) Othman, E. (2024, January 11). Malaysia-singapura Rasmi Titik pertemuan jejambat Marin Projek RTS Link. MalaysiaGazette. https://malaysiagazette.com/2024/01/11/malaysia-singapura-rasmi-titik-pertemuan-jejambat-marin-projek-rts-link/ 

(in Malay) BERITA Mediacorp. (22 Jan 2021). Singapura mulakan pembinaan stesen Laluan RTS JB-S'pura https://berita.mediacorp.sg/singapura/singapura-mulakan-pembinaan-stesen-laluan-rts-jb-s-pura-54956 

Video (Berita Mediacorp, Malay)




Thursday, October 22, 2020

West Express Ginga (including things to do in San'in)

West Express Ginga is a luxury sleeper train operated by JR West. It runs between Kyoto/Osaka Area and Izumoshi in the San'in area. The rolling stock used in this sleeper service is the 117 series. The 117 series train was formerly used as shinkaisoku (新快速, special rapid service) commuter trains in the Kyoto/Osaka/Kobe area by the Japanese National Railways (kokutetsu, 国鉄, 國鐵). Btw, JNR was privitised and split into 6 passenger companies according to region and one freight company. However, some of those old trains was refurbished for use for sleeper services. Originally, this sleeper service was slated to start running by May 2020, but was postponed to September 11 the same year due to coronavirus infections.




117 Series for use on this sleeper service

San'in area
Made up of Shimane and Tottori, as well as the northern part of Yamaguchi Prefecture in the Chugoku region.

map of Japan with the San'in region shaded in red

rail map of the Chugoku area

Map of San'in (Japanese)

Access to San'in area







Service patterns
This sleeper service makes 2 round trips between Kyoto/Osaka and Izumoshi weekly since the start of operations on 11 September 2020. However, the eastbound service terminates at Osaka, so passengers going to Kyoto must switch to a shinkaisoku or kaisoku upon arriving in Osaka. Not just a sleeper service, it also operates as a daytime limited express train from Osaka to Shimonoseki in Yamaguchi Prefecture.

Sanin Route


Sanyo Route



Configuration
The West Express Ginga uses 6-car 117 series trains. 

Car 1 is the reserved green car seating. This car have a capacity for 16 daytime passengers during daytime, and half of that for sleeper services. For daytime services, box seats are arranged with a foldable table and lamp. But, those box seats can be converted to a single bed with the table folded away during nightime. This car also have a mini longue space which offers some books.


layout of car 1

Car 2 is a standard car only reserved for female passengers. It comprises of a mixture of reclining seats and couchette style sleeping areas. Those couchette style berths are fitted with individual lightning for each berth and luggage storage space for convenience.

layout of car 2

Car 3 comprises both standard compartment and "family cabins" which have a bench style seating that can be folded out into a sleeping area and can house families of 3 to 4 people. It also houses a free space area equipped with books and magazines for passengers to use when they want to get up and stretch their legs.
layout for car 3

standard seating area with reclining seats

family cabins

free space area

Car 4 houses a multi-purpose recreational space for passengers to hang out where 4 of its tables have inlaid board games such as chess and backgammon, as well as also used for events.
layout for car 4

layout for car 5


inside car 4


Car 5 is a standard car that houses couchette style sleeping areas, which has "nobi-nobi" seats where passengers can lie flat and sleep. 

sleeping berths in car 5

layout of car 6


Car 6 houses 5 premium green car cabins which offers sitting benches that can be converted to beds. 4 of the cabins are for multiple travelers, which holds up to 3 passengers during daytime and 2 during night time, while the other one is for single travelers. This car also has a free space area when passengers can seat and enjoy the passing scenery.

a green car private cabin in car 6
free space area in car 6



Things to do in San'in area
U/C

Suggested Itinerary




Day 0 - Kyoto ⇾ Izumoshi (West Express Ginga)
Day 1 - Izumoshi
Morning: Izumo Taisha Shrine and Former Taisha Station
Lunch at Izumoshi
Afternoon: JR San-in Line - Izumoshi ⇾ Matsue (46 mins) 
or Ichibata Railway - Izumotaisha-mae ⇾ Matsue Shinjiko Onsen station (1hr )
Afternoon: Matsue Castle 
Dinner + Hotel/Ryokan stay at Matsue
Day 2 - Matsue
Breakfast at accomodation + check out at Matsue accomodation
Take 25 min shuttle bus
Morning: Yushien Garden
Lunch 
Afternoon: JR San-in Line - Matsue ⇾ Yasugi (20 mins local train), then change to shuttle bus (20 mins from Yasugi Stn)
Afternoon: Adachi Museum of art
Evening: Samurai District + dinner
Evening: JR San-in Line - Matsue ⇾ Yonago (37 mins)
Evening: check in at Yonago accomodation
Day 3 - Yonago
Breakfast at accomodation + check out
Morning: Mt Daisen
Lunch
Afternoon: Local Train to Sakaiminato + Eshima Grand Bridge
Evening: Stroll around Yonago town and have dinner
Night: Yonago ⇾ Osaka (West Express Ginga)



Merchandise
Plarail S-39 West Express Ginga (JPY 2640 tax incl)

Riding the West Express Ginga
Video in Japanese only




References























Tuesday, August 18, 2020

JB Singapore RTS Link to be completed by 2026.

Hi everyone,

みなさんこんにちは!

Are you looking forward to the year 2026 when the RTS link to JB's Bukit Chagar Station will be commerce operations?

The Rapid Transit System consists of two stations, Woodlands North and Bukit Chagar. The RTS Woodlands North station on the Singapore side is linked to the existing Thomson-East Coast Line station while Bukit Chagar Station will have separated Customs facilities from the current Customs complex. Bukit Chagar Station will be located just north of KTMB JB Sentral Station and will be connected to the Iskandar Malaysia Terbau BRT line. BRT stands for Bus Rapid Transit, where buses runs on delicate roads seperated from normal traffic. The Iskandar BRT will maybe be starting operations by 2022. JB Sentral is where intercity KTM trains depart and arrives. This includes the Shuttle Terbau services which depart from here to Woodlands Checkpoint. The depot for the line is initially planned to be located in Mandai Depot as initial plans is that the RTS link will have MRT trains similar to the TEL. But a change in plans by Malaysia was made to cut costs. Thus, the depot was relocated to Wadi Hana, located along the Terbau Highway as shown in the map below. Meanwhile, the RTS will instead use LRT trains similar to the Ampang Line in the greater KL area. Initially planned to start operations in 2024, but due to the COVID-19 crisis and Movement Control Order (MCO), the completion date was pushed back to 2026 provided if construction starts by Jan 2021. Once the RTS starts operation, KTMB train services to Singapore will cease operations. 

New LRT Ampang Line Train Video Walkthrough ( MALAYSIA PUBLIC ...

An Ampang Line LRT train 

Train cars on TEL will have five doors, instead of four, on each ...

A Thomson-East Coast Line CT251 train


Bukit Panjang LRT  - RTS line not going to use this kind of LRT train.







Personally, I feel that the RTS link project is definitely necessary as it helps boosts the economy of the two neighboring countries together. Moreover, the line helps reduces congestion along the Causeway. Furthermore, it is convenient for our fellow Malaysians who work in Singapore. Lastly, the links help to bring our fellow Malaysians and Singaporeans together. Hope this pandemic situation improves ASAP and salutes and 頑張って to our frontline workers who work and slog tirelessly to keep us safe so that construction can start ASAP! 加油!Semoga Berjaya!


Map of RTS Link in English


Map in Malay



Source: 

Nelson Benjamin and Vanessa Devi (2020, 31 Jul) RM10bil RTS Link to go ahead, The Star Malaysia. Retrieved on 18 August 2020 from https://www.thestar.com.my/news/nation/2020/07/31/rm10bil-rts-link-to-go-ahead 



Iskandar Bus Rapid Transit (BRT) map taken from https://imbrt.com.my/ 



Thank You Frontline Workers Who Work Stock Illustration 1707662308

lifehouse」のYahoo!検索(リアルタイム) - Twitter(ツイッター)を ...感謝 心から。 | だひこのワードローブ

P.S. Thr RTS to JB is not the only proposed rail link to Malaysia as there will be a new high speed rail connecting Singapore all the way to Kuala Lumpur by 2031. The high speed rail (HSR) to KL will slash travel times from 4 hours by plane (inclusive of check in, security and getting to city centers), 6 hours by car (excluding traffic at the Causeway or 2nd link) and 8 hours by KTMB trains, to just 90 minutes by HSR. 

Btw, the HSR was initially said to be completed by 2026. However, after the defeat of the Barisan Nasional party led by former PM Najib in May 2018, the HSR was scrapped by Mahathir because of high costs. But, on 5 September, the HSR was announced to start operations by 2031. Meanwhile, it is said that there will be a cheaper alternative, which is upgrading the existing KTM line between KL and SG, with an extension to Jurong East.



E7 Series Shinkansen high speed train kagayaki at Tokyo Station, Japan


KTM Intercity Train, Malaysia

Updates
22 Nov 2020: Online groundbreaking ceremony at Bukit Chagar virtually by Johor's ruler Sultan Ibrahim Iskandar, Johor Crown Prince Tunku Ismail Sultan Ibrahim, Malaysia's Transport Minister Wee Ka Siong, Johor Chief Minister Hasni Mohammad and other government officials.  The station will be operated by MRT Corp. Next to the station is the ICQ building and transportation hub. Whether the RTS station will be linked to KTM JB Sentral station is still unknown.

groundbreaking ceremony

Layout of Bukit Chagar Station
Photo by MRT Corp. Malaysia

planned location of Bukit Chagar terminal station


26 Nov 2020: construction contract for Woodlands North is awarded by Land Transport Authority to Japanese company Penta Ocean Construction Co Ltd. (五洋建設株式会社Goyō Kensetsu Kabushiki-gaisha), which also in charge of Singapore's Thomson East Coast Line. The contract includes construction of tunnels to the station as well as the CIQ building.

Dec 2020: Sources has shown that Malaysia Government is planning to end HSR line in JB's Bukit Chagar instead of the original 2016 plan to end in Jurong East in Singapore. However, a HSR line between KL and Bukit Chagar is redundant because there is already existing KTM double tracking project that will bring down KL to JB travel time from 6 hours to 3-3.5 hours and doing so only duplicates existing infrastructure. Lastly, by doing so, the Malaysian Government have to pay RM 300m compensation to Singapore.




1 Jan 2021: KL SG HSR terminated after the 31 Dec 2020 agreement lapsed by both countries regarding changes proposed by Malaysia Government. 




References











Minor amendment to LRT Mutiara Line won’t have big effect on environmental impact assessment, says MRT Corp CEO

Source: Malay Mail MRT Corp chief executive officer Datuk Mohd Zarif Hashim said the minor amendment involved the LRT Mutiara Line alignment...